Apple The Exchange TRX pavilion with its layered canopy roof and park plaza

Case study · Retail · Kuala Lumpur

Apple The Exchange TRX

Structural engineering for the interior fit-out of Malaysia's first Apple flagship store, delivered as part of the Design & Build team.

Store levels engineered
3
Structural steel
180t
Longest transfer truss span
24m
Months, design to handover
9

01 / Overview

Trusted with firsts.

L+W was proud to be part of the Design & Build team behind the interior fit-out of Malaysia's first-ever Apple flagship store, at The Exchange TRX in Kuala Lumpur.

The store drops from a glass pavilion on TRX City Park through three levels, around a central forum under a stepped, back-lit ceiling. Behind those calm surfaces sits a dense frame of new steel that L+W designed to hang from, and bear onto, the mall's existing concrete structure.

It followed straight on from our work on the first Tesla 3S Centre in Cyberjaya. Two firsts, back to back, delivered by a team where senior engineers stay hands-on from concept to completion.

Looking up through the stepped, back-lit ceiling ribs to the central skylight
Bird's-eye view of the forum with product tables and the glazed back wall
Stepped white ceiling rising to a square skylight above the upper sales floor

02 / The challenge

A sculptural interior, built inside a finished mall

Every structural element had to disappear. The ceiling ribs, forum wall and feature stair are read as continuous, seamless surfaces, so the steel behind them had to be stiff enough that panels stayed true to a few millimetres under load, temperature and footfall.

All of it had to land on an existing building. New loads were taken back to the mall's columns and transfer beams without strengthening works that would disturb the floors above and below, while the rest of The Exchange TRX stayed open.

  1. 01

    Long-span transfer truss over the forum wall

    A storey-deep steel truss spans the full width of the forum, carrying the stone-clad wall and the gallery edge above a column-free opening. It was set out to the stone joint pattern so the truss nodes sit behind panel joints.

    Full elevation of the transfer truss spanning the forum wall
    The full truss elevation before cladding.
    Centre of the long-span truss carrying the stone-clad forum wall
    Truss mid-span, with stone panels set out below.
  2. 02

    Suspended framework for the stepped ceiling

    Galvanised hanger frames and diagonal bracing hang the ceiling ribs from the slab above, with adjustable connections so every tier could be trued to the architect's curves before the panels went on.

    Galvanised steel hanger frames suspended from the existing slab above
    Hanger frames carry the ceiling from the existing slab.
    Installers on scissor lifts fixing curved soffit panels under the stepped ceiling
    Curved soffit panels being fixed to the secondary steel.
  3. 03

    Feature stair

    The stair's folded-plate stringers were designed for a lively but comfortable feel underfoot, then propped and checked in place before the sculpted white finish was applied.

    Steel stringers of the feature stair supported inside dense scaffolding
    Feature stair steelwork propped during erection.
    White sculpted feature stair with glass balustrades connecting the store levels
    The finished feature stair linking all three levels.

03 / Before & after

What sits behind the finish

Drag across each view to see the structure we engineered, then the space it became.

Upper atrium completed and full of visitors
Upper atrium during construction with plant and scaffolding
ConstructionCompleted
The upper sales floor during fit-out, and on opening day.

04 / Timeline

From survey to opening day

  1. Q3 2024

    Survey & design

    Scan of the existing structure, load paths agreed with the mall's engineer, steel design issued for fabrication.

    Primary steel beams and orange temporary supports over the lower-level works
  2. Q4 2024

    Primary steel & transfer truss

    Transfer truss lifted and bolted in; primary grid connected back to the existing columns.

    Long-span steel truss running above the forum wall, beneath the ceiling ribs
  3. Q1 2025

    Ceiling frame & feature stair

    Hanger frames, bracing and stair steelwork erected and surveyed to tolerance.

    Diagonal steel bracing within the ceiling support framework
  4. Q2 2025

    Cladding, lighting & finishes

    Stone wall panels and ceiling ribs installed; lighting commissioned around the skylight.

    Concentric ceiling ribs lit for the first time around the skylight
  5. June 2025

    Doors open

    Malaysia's first Apple store welcomes its first customers.

    Opening day crowds on the upper sales floor beneath the curved ceiling
“Nothing on this project was allowed to look structural. L+W's job was to make sure all of it was.”
Project Director, Design & Build contractor